-Stepwise investment with smaller risks and optimized profit generation
-Excellent plant availability and reduced need for backup capacity due to multi-unit installation
-Net plant electrical efficiency of over 49%
-Full plant output at high altitudes and in hot and dry ambient conditions
-High part-load efficiency
-Fast start-up, 5 min from hot standby to full plant load
-Minimal water consumption with closed-circuit radiator cooling
-Low gas fuel pressure requirement
-Maintenance schedule independent of the number of starts or trips.